Faced with spiralling costs after struggling to find a contractor that could meet its needs within budget, the college was on the brink of cancelling the project until Directline Structures stepped in. Our lean and sustainable design and construction methods enabled us to exceed the client’s original specifications and untimately saved the college £300,000.